Opened 11 years ago

Closed 11 years ago

#4083 closed Bug (fixed)

Wrong shades of progress in Inspector pieces view.

Reported by: Rolcol Owned by: jordan
Priority: Normal Milestone:
Component: libtransmission Version: 2.21+
Severity: Normal Keywords:
Cc:

Description

For example, complete pieces are supposed to be solidly blue. They appear fine in Availability when they complete, but switching back to Progress gives me different shades than they should be.

Change History (3)

comment:1 Changed 11 years ago by livings124

  • Component changed from Mac Client to Transmission

#4082 is a side-effect of this.

comment:2 Changed 11 years ago by jordan

  • Component changed from Transmission to libtransmission
  • Owner changed from livings124 to jordan
  • Status changed from new to assigned

comment:3 Changed 11 years ago by jordan

  • Milestone None Set deleted
  • Resolution set to fixed
  • Status changed from assigned to closed

(trunk libT) #4083 "Wrong shades of progress in Inspector pieces view." -- fixed.

The problem was reported by Rolcol and tracked down by livings124. It's flashing orange because the completion in "availability" doesn't match the completion in in "progress", which corresponds with tr_torrentAvailability() and tr_torrentAmountFinished(). tr_cpGetAmountDone() was recently reworked in r12012 for #4048, which caused the problem. Both functions need to sample the torrent using the same methodology so that their results can be used together.

Note: See TracTickets for help on using tickets.